358 Anti-Climb Security Fence Panels, Factory Direct Supply
What Direct Supply Changes
Buying through a trader adds a step between the works and the site. Buying direct removes it, which matters most when something has to be corrected: the panel, the fixing and the finish are all made in one place, so a query does not have to travel through a third party.
Panel, Post and Fixing as One Set
Panels are quoted with the parts that hold them, not as a panel alone.
Welded 358 mesh panels with folded edges
Square or rectangular hollow section posts, with cap and base plate or footing detail
Full-height flat bar clips or security bolts matched to the post section
Gate leaves with frame, hinges and latch where a gate is required
Clips are matched to the post section rather than picked from a general list, because a clip that does not seat on the post is the most common reason a panel rattles.
Clips, caps and gate hardware are quoted against the post section and the leaf weight, so nothing on site has to be improvised.
Checks Before Packing
Each consignment is checked against the order before it is packed.
Panel count and height against the packing list, the post section and length, the clip type and quantity, and the finish called for on the order. Panels are banded so that a bundle can be lifted without the edges rubbing, and gate hardware is packed separately and marked against the leaf it belongs to.
Marking matters more than it sounds: a two-leaf gate installed with mixed hardware does not close square, and the fault appears weeks later.
Where the Panels Are Used
Industrial and utility perimeters
Storage yards and compounds
Internal partitions and roofline panels
Boundaries where an open mesh fence would be too easy to climb
Height and Wind Load
A dense panel presents a solid face to the wind, so the post spacing and section are set by wind load rather than by panel weight.
Send the site's wind region and the height required. Where the run is exposed, spacing tightens and the post section grows; quoting a panel without that information is how a run ends up leaning after the first storm.